Demolition of the Commons on the San Francisco State Campus

About This Item

Remnants of the Commons building during demolition on the San Francisco State University campus, circa January–March 1973. Heavy equipment, trucks, and a crane are visible removing debris from the former student dining and gathering facility. The demolition cleared the site where the new Student Union—later named the César Chávez Student Center—would be constructed. Campus buildings such as Psychology Building and other academic structures are visible in the background.

Identifier
TP-ATA-1259
Date
1973
Context

Credits: Some descriptions were developed with the assistance of ChatGPT, an AI language model by OpenAI.

Geographic Coverage
San Francisco, CA
Temporal Coverage
1970s
Type
Still Image
Format
35mm Slide
Source
San Francisco State University Archives
Rights
Public
Views
448

Related Items

Before the Construction of SF State Lake Merced Campus (c. early 1950s) Construction Site on the San Francisco State Campus After Demolition of the Commons Construction Site on the San Francisco State University Campus Excavation of the Former Commons Site – San Francisco State University – 1973 Excavation of the Former Commons Site – San Francisco State University – 1973 Excavation of Former Commons Site with Psychology and Thornton Halls – San Francisco State University – 1973 Construction Work Following the Demolition of the Commons, San Francisco State University Campus San Francisco State College Lake Merced Campus Site Before Construction — 1952 Excavation of Former Commons Site – San Francisco State University – 1973 SF State Lake Merced Campus Before the Construction Excavation of Former Commons Site – San Francisco State University – 1973 Remains of the Commons During Demolition – San Francisco State University – 1973 Excavation Work at Former Commons Site – San Francisco State University – 1973 Photograph of demolition of the Commons on the San Francisco State campus, circa January-March 1973, to clear the site of SF State campus with crane and heavy equipment to remove debris. The Huts where student organizations were located appears in this image to have been cleared during the Winter Break. The Gallery Lounge that was not on the construction site remained a venue for exhibits and lectures. The Speakers Platform (the first college-sanctioned free speech platform in the nation) is located on the triangular grass section in front of the Gymnasium. The Student Union was completed in October 1975 and named the Cesar Chavez Student Center on May 5, 1994. Construction of the Cesar Chavez Student Center San Francisco State College Lake Merced Campus Before Construction Construction of the Cesar Chavez Student Center Construction Site on the San Francisco State Campus (Newspaper Reproduction) Construction of the J. Paul Leonard Library Addition – Foundation Work Construction of the J. Paul Leonard Library Addition (Concrete Pour)